# E1256CXMWPR — TO ENGINEER, PROCURE AND CONSTRUCT A WATER ELECTROLYSIS HYDROGEN GENERATION PLANT, WHICH MUST BE INTEGRATED WITH THE EXISTING RENEWABLE POWER PLANT FOR “GREEN H2 PRODUCTION” AT ERIC ROSHERVILLE FOR A PERIOD OF THREE (3) YEARS

TO ENGINEER, PROCURE AND CONSTRUCT A WATER ELECTROLYSIS HYDROGEN GENERATION PLANT, WHICH MUST BE INTEGRATED WITH THE EXISTING RENEWABLE POWER PLANT FOR “GREEN H2 PRODUCTION” AT ERIC ROSHERVILLE FOR A PERIOD OF THREE (3) YEARS Province : Gauteng.  Entité contractante : ESKOM.  Ré…

Source: QUOTA CÔTE — https://quotacote.com/opportunites/e1256cxmwpr-to-engineer-procure-and-construct-a-water-electrolysis-hyd--bd7ed23c-be4e-4771-8bf9-71358b253ae4
Last checked by QUOTA: 2026-08-25
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Afrique du Sud [FACT]
- Deadline: 2026-08-28 [FACT]
- Last checked by QUOTA: 2026-08-25 [FACT]
- Sector (QUOTA normalisation): Énergie [ANALYSIS]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- geography: Afrique du Sud
- funder: ESKOM
- buyer: ESKOM

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.