# Boiler Plant Replacement & Hybrid Controls Integration at Eckington Active, Gosber Street, Eckington

NEDDC wishes to appoint a contractor for the design, supply, installation, integration, commissioning and handover of replacement gas-fired boiler plant at Eckington Active.  The installation is required to provide supplementary, resilience and back-up heating capacity to the ex…

Source: QUOTA CÔTE — https://quotacote.com/opportunites/boiler-plant-replacement-hybrid-controls-integration-at-eckington-acti--7f94b6a0-2e67-410a-9909-33686379af1d
Last checked by QUOTA: 2026-09-24
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Royaume-Uni [FACT]
- Deadline: 2026-10-09 [FACT]
- Last checked by QUOTA: 2026-09-24 [FACT]
- Sector (QUOTA normalisation): Autre [ANALYSIS]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- geography: Royaume-Uni
- funder: North East Derbyshire District Council
- buyer: North East Derbyshire District Council

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
