# Construction of 220kV double circuit transmission line connecting Bwishyura Substation to Kigoma substation (56km)

Secteur (source) : Public Administration - Energy and Extractives;Energy Transmission and Distribution.  Projet P180575.  Réf.

Source: QUOTA CÔTE — https://quotacote.com/opportunites/construction-of-220kv-double-circuit-transmission-line-connecting-bwis--9a2b4985-7f1b-49ba-aafb-9fc0fc8a2ba4
Last checked by QUOTA: 2026-10-24
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Rwanda [FACT]
- Deadline: 2026-06-09 [FACT]
- Last checked by QUOTA: 2026-10-24 [FACT]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- geography: Rwanda
- funder: Banque mondiale

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
