# Construction of a concrete wheeled sports facility at The Carrs Park, Wilmslow, SK9 4AA

1. 1 Cheshire East Council ("the Council") requires a single contractor to provide services associated with the construction of a concrete wheeled sports facility at The Carrs Wilmslow, SK9 4AA 1. 2 The Carrs is one of the main open spaces within Wilmslow, in 2025 the steel whee…

Source: QUOTA CÔTE — https://quotacote.com/opportunites/construction-of-a-concrete-wheeled-sports-facility-at-the-carrs-park-w--eacb8f35-b384-4031-b75a-6084110895aa
Last checked by QUOTA: 2026-09-29
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Royaume-Uni [FACT]
- Deadline: 2026-11-20 [FACT]
- Last checked by QUOTA: 2026-09-29 [FACT]
- Sector (QUOTA normalisation): Autre [ANALYSIS]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- geography: Royaume-Uni
- funder: Cheshire East Council
- buyer: Cheshire East Council

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
