# Design and Construction of Someshwari Bridge-3 over Someshwari River, Package-W1

Source: QUOTA CÔTE — https://quotacote.com/opportunites/design-and-construction-of-someshwari-bridge-3-over-someshwari-river-p--12e289cd-f540-4ecd-bb8a-745c0bc6d347
Last checked by QUOTA: 2026-11-04
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Bangladesh [FACT]
- Deadline: 2026-12-08 [FACT]
- Last checked by QUOTA: 2026-11-04 [FACT]
- Sector (QUOTA normalisation): Transport & Infrastructure [ANALYSIS]

## Entities

- geography: Bangladesh
- funder: Banque islamique de développement (IsDB)
- buyer: Banque islamique de développement (IsDB)

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
