# E 3389RTDMWP — The construction of control room incorporated with boardroom and ablution facility at Eskom Research Corona Cage Test Facility in Sunninghill for the period of six (06) months.

The construction of control room incorporated with boardroom and ablution facility at Eskom Research Corona Cage Test Facility in Sunninghill for the period of six (06) months.  Province : Gauteng.  Entité contractante : ESKOM.

Source: QUOTA CÔTE — https://quotacote.com/opportunites/e-3389rtdmwp-the-construction-of-control-room-incorporated-with-boardr--4e209fcb-2215-46d2-b2f9-7040adf945b3
Last checked by QUOTA: 2026-09-15
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Afrique du Sud [FACT]
- Deadline: 2026-09-18 [FACT]
- Last checked by QUOTA: 2026-09-15 [FACT]
- Sector (QUOTA normalisation): Autre [ANALYSIS]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- geography: Afrique du Sud
- funder: ESKOM
- buyer: ESKOM

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
