# Hackney Service Centre cooling system redesign feasibility study

The purpose of this contract is to appoint a lead Architect, working in collaboration with a specialist Mechanical & Electrical Engineer and a Quantity Surveyor, to deliver a comprehensive feasibility study for replacing the end of life secondary cooling system across all 5 floo…

Source: QUOTA CÔTE — https://quotacote.com/opportunites/hackney-service-centre-cooling-system-redesign-feasibility-study-royau--da6d462c-e1ff-4f2f-9718-17cf94005e34
Last checked by QUOTA: 2026-08-24
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Royaume-Uni [FACT]
- Deadline: 2026-07-22 [FACT]
- Last checked by QUOTA: 2026-08-24 [FACT]
- Sector (QUOTA normalisation): Construction & BTP [ANALYSIS]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- geography: Royaume-Uni
- funder: London Borough of Hackney
- buyer: London Borough of Hackney

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
