# Supply, Installation and Maintenance of Two (2) Standby 60kva Power Generators for the African Development Bank Country Office Liberia (COLR)

The African Development Bank (hereafter referred to as “the Bank”) wishes to invite bidders to submit bids for the supply, delivery, installation, commissioning, synchronization, and maintenance of two (2) standby 60kVA power generators for the Bank’s Liberia Country Office in M…

Source: QUOTA CÔTE — https://quotacote.com/opportunites/supply-installation-and-maintenance-of-two-2-standby-60kva-power-gener--585f3840-2830-4992-9d5e-61c01f4b9316
Last checked by QUOTA: 2026-09-17
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Last checked by QUOTA: 2026-09-17 [FACT]
- Sector (QUOTA normalisation): Énergie [ANALYSIS]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- funder: Banque Africaine de Développement
- buyer: Banque Africaine de Développement

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
