# Travaux de construction de 2 Kits (3 salles de classe ,Bureau+magasin et bloc latrine) école pour le fondamental 2  dans la région de Tombouctou

Secteur (source) : Secondary Education;Public Administration - Education.  Projet P164032.  Réf.

Source: QUOTA CÔTE — https://quotacote.com/opportunites/travaux-de-construction-de-2-kits-3-salles-de-classe-bureau-magasin-et--23ad8b92-4821-4b15-bada-86ad669fa623
Last checked by QUOTA: 2026-10-24
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Mali [FACT]
- Deadline: 2026-06-03 [FACT]
- Last checked by QUOTA: 2026-10-24 [FACT]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- geography: Mali
- funder: Banque mondiale

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
