# Tx8 & Tx9 Transformer and Switchgear New Building - Retender

The building of a new enclosure over existing housings which contain the High Voltage (HV) Transformers, known as Tx8 and Tx9, together with the Low Voltage (LV) Switchgear which converts the HV supply into LV power which can be fed into the distribution boards in the buildings…

Source: QUOTA CÔTE — https://quotacote.com/opportunites/tx8-tx9-transformer-and-switchgear-new-building-retender-royaume-uni--dd03f487-3c2d-4d3d-846e-10cf3d70f8e7
Last checked by QUOTA: 2026-08-28
Methodology: https://quotacote.com/a-propos-des-donnees

## Key facts

- Country: Royaume-Uni [FACT]
- Deadline: 2026-10-02 [FACT]
- Last checked by QUOTA: 2026-08-28 [FACT]
- Sector (QUOTA normalisation): Énergie [ANALYSIS]
- Summary: QUOTA editorial summary of the source notice [ANALYSIS]

## Entities

- geography: Royaume-Uni
- funder: THE PIRBRIGHT INSTITUTE
- buyer: THE PIRBRIGHT INSTITUTE

## Limitations

- QUOTA republishes a normalised summary, not the tender documents themselves.
- Commercial details (source dossier, full deadline history, budget) are reserved for subscribers.
